Integraf s.r.o. - Infill-Site Building

Infill-Site Building in the Vacant Area of the Integraf, s.r.o, Company, Náchod
Investor Integraf, s.r.o.
The intention of the investor was to build-up a free area between two existing manufacturing buildings on the premises of Integraf, s.r.o.  The new building expanded manufacturing capacities and connected the previously separated buildings. The respective production hall and the printing machines are located on the ground floor. Part of the building is two storeyed. A large administrative section connected with both the adjacent buildings was placed here. The load-bearing structure of the building consists of a prefabricated reinforced concrete frame. The main facade consists of light-weight concrete blocks. The interior of the hall is illuminated with polycarbonate elongated light wells. The production areas are air-conditioned. In front of the new hall, a roof covering the road interconnecting the existing buildings has been designed. 
Budget € 0.711 mio, w/o VAT
Built-up area 990 sqm
Location of Construction Náchod
Position on the Map map
General Project Architect ORGATEX-NÁCHOD s.r.o.
Project Stage DUR / DSP / DPS
Architectonic Plans Ing. arch. Milan Weiner
General Contractor ORGATEX-NÁCHOD s.r.o.
Realization Period 2012/07 - 2012/12
ID 4739
4739-REFERENCES-INDUSTRIAL-DEVELOPMENT-INTEGRAF-INFILL-BUILDING

Initial Condition

P-4739-Original
Aerial view - before construction, with a gap between the existing hallsBefore construction - with a gap between the existing halls

Project

P-4739-Documentation
First above-ground floor plan - new situationCross-section - finished construction

During Realization

P-4739-Realization
Rough landscaping and relocation of existing underground utilitiesRough landscaping and relocation of existing underground utilitiesPile drillingPile drillingWork on piles
Assembly of reinforced concrete frame of new hallAssembly of reinforced concrete frame of new hallAssembly of reinforced concrete frame of new hallAssembly of reinforced concrete frame of new hallAssembly of reinforced concrete frame of new hall
Assembly of reinforced concrete frame of new hallAssembly of reinforced concrete frame of new hallAssembly of reinforced concrete frame of new hallAssembly of reinforced concrete frame of new hallView of the facade of the new hall after the finished assembly of the reinforced concrete frame
Piling up and compacting construction layers for the floor on the 1st floor4739-R-17-INTEGRAF-INFILL-BUILDING4739-R-18-INTEGRAF-INFILL-BUILDING4739-R-19-INTEGRAF-INFILL-BUILDING4739-R-20-INTEGRAF-INFILL-BUILDING
4739-R-21-INTEGRAF-INFILL-BUILDING4739-R-22-INTEGRAF-INFILL-BUILDING4739-R-23-INTEGRAF-INFILL-BUILDING4739-R-24-INTEGRAF-INFILL-BUILDING4739-R-25-INTEGRAF-INFILL-BUILDING
4739-R-26-INTEGRAF-INFILL-BUILDING4739-R-27-INTEGRAF-INFILL-BUILDING4739-R-28-INTEGRAF-INFILL-BUILDING4739-R-29-INTEGRAF-INFILL-BUILDING4739-R-30-INTEGRAF-INFILL-BUILDING
4739-R-31-INTEGRAF-INFILL-BUILDING4739-R-32-INTEGRAF-INFILL-BUILDING4739-R-33-INTEGRAF-INFILL-BUILDING4739-R-34-INTEGRAF-INFILL-BUILDING4739-R-35-INTEGRAF-INFILL-BUILDING
4739-R-36-INTEGRAF-INFILL-BUILDING4739-R-37-INTEGRAF-INFILL-BUILDING4739-R-38-INTEGRAF-INFILL-BUILDING4739-R-39-INTEGRAF-INFILL-BUILDING4739-R-40-INTEGRAF-INFILL-BUILDING
4739-R-41-INTEGRAF-INFILL-BUILDING4739-R-42-INTEGRAF-INFILL-BUILDING4739-R-43-INTEGRAF-INFILL-BUILDING4739-R-44-INTEGRAF-INFILL-BUILDING4739-R-45-INTEGRAF-INFILL-BUILDING
4739-R-46-INTEGRAF-INFILL-BUILDING4739-R-47-INTEGRAF-INFILL-BUILDING4739-R-48-INTEGRAF-INFILL-BUILDING4739-R-49-INTEGRAF-INFILL-BUILDING4739-R-50-INTEGRAF-INFILL-BUILDING
4739-R-51-INTEGRAF-INFILL-BUILDING4739-R-52-INTEGRAF-INFILL-BUILDING4739-R-53-INTEGRAF-INFILL-BUILDING4739-R-54-INTEGRAF-INFILL-BUILDING4739-R-55-INTEGRAF-INFILL-BUILDING
4739-R-56-INTEGRAF-INFILL-BUILDING4739-R-57-INTEGRAF-INFILL-BUILDING4739-R-58-INTEGRAF-INFILL-BUILDING4739-R-59-INTEGRAF-INFILL-BUILDING4739-R-60-INTEGRAF-INFILL-BUILDING
4739-R-61-INTEGRAF-INFILL-BUILDING4739-R-62-INTEGRAF-INFILL-BUILDING4739-R-63-INTEGRAF-INFILL-BUILDING4739-R-64-INTEGRAF-INFILL-BUILDING4739-R-65-INTEGRAF-INFILL-BUILDING

Completed

P-4739-Completed
4739-U-01-INTEGRAF-INFILL-BUILDING4739-U-02-INTEGRAF-INFILL-BUILDING4739-U-03-INTEGRAF-INFILL-BUILDING4739-U-04-INTEGRAF-INFILL-BUILDING4739-U-05-INTEGRAF-INFILL-BUILDING
4739-U-06-INTEGRAF-INFILL-BUILDING