Integraf s.r.o. - Infill-Site Building
Infill-Site Building in the Vacant Area of the Integraf, s.r.o, Company, Náchod
Investor | Integraf, s.r.o. |
The intention of the investor was to build-up a free area between two existing manufacturing buildings on the premises of Integraf, s.r.o. The new building expanded manufacturing capacities and connected the previously separated buildings. The respective production hall and the printing machines are located on the ground floor. Part of the building is two storeyed. A large administrative section connected with both the adjacent buildings was placed here. The load-bearing structure of the building consists of a prefabricated reinforced concrete frame. The main facade consists of light-weight concrete blocks. The interior of the hall is illuminated with polycarbonate elongated light wells. The production areas are air-conditioned. In front of the new hall, a roof covering the road interconnecting the existing buildings has been designed.
|
Budget | € 0.711 mio, w/o VAT | |
Built-up area | 990 sqm | |
Location of Construction | Náchod | |
Position on the Map | map | |
General Project Architect | ORGATEX-NÁCHOD s.r.o. | |
Project Stage | DUR / DSP / DPS | |
Architectonic Plans | Ing. arch. Milan Weiner | |
General Contractor | ORGATEX-NÁCHOD s.r.o. | |
Realization Period | 2012/07 - 2012/12 | |
ID | 4739 |

Initial Condition
Project
During Realization
Completed
Design Work Latest News
Warehouse Hall in the Company of Isolit-Bravo
16. 4. 2015
In the town of Jablonné nad Orlicí, a new large-capacity warehouse with shipping department is intended to be built.
Project for the Company of Mesa Parts s.r.o.
30. 10. 2014
We are working on a project for extension of a manufacturing hall on the premises of Mesa Parts s.r.o. facility in the village of Vysokov u Náchoda.
Launch of new web
24. 10. 2014
We have launched our new website today.
SEMET II Manufacturing Hall
22. 7. 2014
A new manufacturing hall of SEMET s.r.o. has been launched in the town of Červený Kostelec.